|
2026-07-10
|
|
|
2026-07-10
|
|
|
2026-07-07
Notice of Construction on the North Service Road of the A-40 and Traffic DisruptionsHydro-Québec, in collaboration with its contractor GTEK, will soon begin work on the service road on both sides of the entrance located on Rue Frédéric-Back.
Notice of Construction on the North Service Road of the A-40 and Traffic DisruptionsHydro-Québec, in collaboration with its contractor GTEK, will soon begin work on the service road on both sides of the entrance located on Rue Frédéric-Back. Work will begin on July 9, 2026, and is expected to last approximately 35 workdays. During this period, one traffic lane will remain open, and access to Rue Frédéric-Back will be maintained. However, please note that access will be completely closed only during the phase of work involving the crossing of Rue Frédéric-Back. Traffic signs and flaggers will be present at the construction site to ensure the safety of workers and the public and to direct traffic. For everyone’s safety, please respect the signs in place. Thank you for your understanding.
|
|
|
2026-06-18
Repair work on the French drains and the outdoor fire protection system at the Laboratoire de santé publique du QuébecRepair work on the French drains and the outdoor fire protection system will be carried out from July 13 to July 20, 2026, at the Laboratoire de santé publique du Québec, located at 20045, Chemin Sainte-Marie.
Repair work on the French drains and the outdoor fire protection system at the Laboratoire de santé publique du QuébecRepair work on the French drains and the outdoor fire protection system will be carried out from July 13 to July 20, 2026, at the Laboratoire de santé publique du Québec, located at 20045, Chemin Sainte-Marie. The work will include, among other things, the installation of a new water supply system to provide water to the fire protection network. The work will be carried out by the contractor St-Denis Thompson Inc., with a connection to the Chemin Sainte-Marie water supply network.
For everyone’s safety, please respect the signs in place. Thank you for your understanding.
|
|
|
2026-01-06
Electrical work on Boulevard des Anciens-Combattants, on the A-40 East on-ramp, will take place from January 6 through October 2026As part of the framework contract for the maintenance of underground civil infrastructure, Hydro-Québec will be performing electrical work at Square Bellevue from January 6 through October 2026, between 7 a.m. and 5 p.m.
Electrical work on Boulevard des Anciens-Combattants, on the A-40 East on-ramp, will take place from January 6 through October 2026As part of the framework contract for the maintenance of underground civil infrastructure, Hydro-Québec will be performing electrical work at Square Bellevue from January 6 through October 2026, between 7 a.m. and 5 p.m.
Here is the current status of the three phases:
For everyone’s safety, please respect the signs in place. Thank you for your understanding. |
|
Info-collectes |
2025-12-15
Check the 2026 collection calendarCheck the 2026 collection calendar |
Collecte des branches
Collecte des branches
Branch collection
Monday, December, 7 2026, from 07:00 a.m.
Vous êtes sur le point de vous inscrire à un événement déjà débuté et vous serez facturé le plein montant.
Voulez-vous continuer?

.png)
