Stationnement de nuit - PERMIS ✅ du 7 janvier au 8 janvier
Stationnement de nuit - PERMIS ✅ du 7 janvier au 8 janvier
2025-12-01
When is overnight parking permitted in the northern sector?
When is overnight parking permitted in the northern sector?
If no snow clearing operations are in progress or planned for the night (whether to remove or
move snow, de-ice streets or spread abrasives or ice melters), parking is authorized by notice from the City.
In the absence of a notice, overnight parking is still prohibited on all Sainte-Anne-de-Bellevue streets to ensure efficient snow removal. Snow removal operations remain a priority over overnight parking.
Connection work on Boulevard des Anciens-Combattants from January 6 to July 31, 2026
As part of the civil maintenance framework agreement for underground infrastructure, Hydro-Québec will be carrying out connection work for Square Bellevue from January 6, 2026, to July 31, 2026, between 7 a.m. and 5 p.m.
Connection work on Boulevard des Anciens-Combattants from January 6 to July 31, 2026
As part of the civil maintenance framework agreement for underground infrastructure, Hydro-Québec will be carrying out connection work for Square Bellevue from January 6, 2026, to July 31, 2026, between 7 a.m. and 5 p.m.
The area affected by the work extends over 1.3 km, from 307 Boulevard des Anciens-Combattants towards the A-40 East ramp, passing through rue Poultry Cottages;
The right lane northbound on rue des Anciens-Combattants will be closed along the entire length of the work zone;
Construction signage, including visual markers and traffic signs, will be installed to inform and guide users;
One lane will remain open, with a width of 3.5 meters.
The work will be carried out in three successive phases, each lasting 10 to 12 weeks. The order of the phases will be as follows:
1. Phase 2;
2. Phase 3;
3. Phase 1.
For everyone’s safety, please respect the signs in place.
Household hazardous waste (e.g. paints and solvents, pesticides, batteries, propane tanks, cleaning products, fluorescents and CFLs, etc.)
Bulky waste
Residues subject to voluntary collection
Information and communications technology waste (e.g. screens, computers, printers, etc.)
Green and Fall Waste
Soil
Waste bin management
It is MANDATORY to put all household waste in a rigid bin with a lid.
You can place your bin at the curb from 7 p.m. on the day beforte the collect to 7 a.m. the morning of, so as not to miss the truck.
Please return your bin to the side or back yard of your residence as soon as possible after pickup, and no later than 7 p.m. on collection day.
Our Municipal by law states that rolling bins should not be stored on the front yard. Bins must be placed in an area that is not visible from the street or hidden behind a privacy wall.
Garbage collection is now every two weeks at all times, as the city seeks to implement solutions to optimize the management of household waste, and thus improve our community’s environmental impact.
In Sainte-Anne-de-Bellevue, only 43% of residual waste generated is recovered. By 2025, our goal is to have 70% of residual materials recycled.
The size of wheeled bins for household waste collection is of 120, 240 or 360 liters. Waste placed in any other bin will not be collected. *
*Your garbage bags must be placed in the closed bin.
RECYC-QUÉBEC mobile application
COOKIES SETTINGS
En cliquant sur « Accepter », vous acceptez le stockage de témoins (cookies) sur votre appareil pour améliorer les performances de notre site Web et recueillir certaines statistiques de fréquentation via Google Analytics. Le respect de votre vie privée est important pour nous, nous ne collectons aucune donnée personnelle sans votre consentement.
En cliquant sur « Accepter », vous acceptez le stockage de témoins (cookies) sur votre appareil pour améliorer les performances de notre site Web et recueillir certaines statistiques de fréquentation via Google Analytics. Le respect de votre vie privée est important pour nous, nous ne collectons aucune donnée personnelle sans votre consentement.