2026-07-10

2026-07-10

2026-07-07

Notice of Construction on the North Service Road of the A-40 and Traffic Disruptions

Hydro-Québec, in collaboration with its contractor GTEK, will soon begin work on the service road on both sides of the entrance located on Rue Frédéric-Back.

2026-06-18

Repair work on the French drains and the outdoor fire protection system at the Laboratoire de santé publique du Québec

Repair work on the French drains and the outdoor fire protection system will be carried out from July 13 to July 20, 2026, at the Laboratoire de santé publique du Québec, located at 20045, Chemin Sainte-Marie.

2026-01-06

Electrical work on Boulevard des Anciens-Combattants, on the A-40 East on-ramp, will take place from January 6 through October 2026

As part of the framework contract for the maintenance of underground civil infrastructure, Hydro-Québec will be performing electrical work at Square Bellevue from January 6 through October 2026, between 7 a.m. and 5 p.m.

Info-collectes

2025-12-15

Check the 2026 collection calendar

Contact Form



Recherche

News

News

2nd public information session: inspection of submersible pump connections to municipal sewer systems

October 11th 2024
2nd public information session: inspection of submersible pump connections to municipal sewer systems

On August 9, the sanitary sewer system in the North sector was put to the test by extreme weather conditions, causing considerable damage to homes and municipal infrastructure.

In this context and faced with growing climate challenges, the City of Sainte-Anne-de-Bellevue is determined to adopt proactive measures to strengthen the resilience of its municipal infrastructure and minimize the impact on its citizens. Therefore, the City is undertaking an inspection and analysis process. 

As part of this process, the City held an initial public information session on October 9, focusing on residential submersible pump connections in the North sector. This meeting initially excluded homes on Aumais and Vallée streets located north of Meloche and Cypihot streets.

A second public information session is now being held for residents of Aumais and Vallée streets located north of Meloche and Cypihot streets to discuss the inspection process for residential submersible pump connections to municipal sewer systems.

  • WHAT : Invitation to residents of Aumais and Vallée streets located north of Meloche and Cypihot streets, as well as residents of the North sector of Sainte-Anne-de-Bellevue.
  • WHEN : Thursday, October 17, 2024, at 7 p.m.
  • WHERE : Chalet Peter-Williamson (300 rue Cypihot, Sainte-Anne-de-Bellevue, QC H9X 4A7)

Inspections carried out as part of this process are necessary to verify the compliance of submersible pump connections and to ensure that they are not connected to sanitary sewers, in accordance with municipal by-laws.

During the information session, residents will be provided with all the details regarding the inspections, including how to book an appointment with the inspection company, how the inspection will be carried out, and the steps following the inspection.

For further information, please contact:

Martin Bonhomme P.Eng, CPA, MBA
General Manager
514 457-6834
mbonhomme@sadb.qc.ca


  Back